West Fargo is one of the fastest-growing cities in North Dakota. It went from 14,940 residents in 2000 to 38,626 at the 2020 census. Much of that growth happened inside existing homes as well as on new streets. Basements get finished, spare rooms become bedrooms, and older walls finally get replaced after years of patching. Fargo Elite Drywall hangs, tapes, and finishes drywall for homeowners across the city, from first-time buyers finishing a lower level to families updating a house they've owned for decades.


We handle full rooms and small fixes. That includes new walls and ceilings in a basement finish, board for an addition or remodel, and repairs that have to blend into the wall around them. The goal on every job is the same: flat surfaces, crisp corners, seams you can't find under paint, and a work area left clean when we pack up. If you have a project coming up, we'll come see the space, talk through your options, and give you a clear plan before the first sheet comes off the truck.

Request a FREE Quote.

Get the numbers you need to plan with confidence—no pressure, just clear and honest pricing.

Based Next Door in Fargo

Fargo Elite Drywall works out of Fargo, so a job in West Fargo is a quick run down I-94 or US 10, not a long haul from out of town. Being that close lets us check on drying compound between coats, come back for touch-ups without a long wait, and keep your project on the schedule we agreed to. Every estimate starts with an in-person look at your rooms. The quote you get lists the board, the finish level, and how we'll protect and clean your home, so nothing is left to guesswork. You'll know who's coming, when they'll arrive, and what they're working on each day.

From Sheyenne Crossing to a City on the Grow

West Fargo began as Sheyenne Crossing, a Northern Pacific Railway whistle stop named for the nearby Sheyenne River. It was renamed Haggart after landowner John E. Haggart. It became a packing town when a group of farmers opened the Equity Packing Plant in 1919. After Armour and Company bought the plant in 1925, the settlement became the Village of West Fargo, and most residents in the 1930s worked in the packinghouse. That's why West Fargo High School teams are still called the Packers. The plant closed in 1960, the city merged with Riverside in 1989, and the population has grown at every census since 1940.


All that growth left the city with homes from many different eras. Houses built when the city held a few thousand people stand alongside homes finished in the last few years, and about 16,000 housing units were counted in 2020. For drywall, that range matters. Older homes tend to need repairs and partial replacements that have to match the walls already in place, often after a plumbing, electrical, or window update. Newer homes more often need basement finishes and added rooms. There, the challenge is matching the builder's finish upstairs so the new space doesn't look like an afterthought.

Climate, Rooms and the Right Board

The area has a humid continental climate, with warm, often humid summers and winters that can get severely cold. Joint compound reacts to both. In winter, the work area needs steady heat so compound cures evenly and bonds properly. In a basement, that can mean confirming the furnace actually reaches the space or bringing in temporary heat. Summer brings the opposite problem. June is the wettest month on record at the nearby NOAA weather station, and damp air stretches drying times. We allow extra time between coats and run a dehumidifier when the room needs one.


The board itself changes from room to room. Bathrooms and laundry areas get moisture-resistant panels, and ceilings can take a sag-resistant board that stays flat between joists. Walls and ceilings shared with an attached garage often require fire-rated board, and we follow whatever your plans or inspector specify instead of guessing. In a below-grade basement, mold-resistant board is worth considering on exterior walls, especially if the space has ever had dampness. We'll explain each choice in plain terms so you know what's going into your walls and why.

What Drywall Work Looks Like Here

This is a young city. The median age at the 2020 census was 33.8, and more than a third of households had children under 18. That shapes the projects: many are about making room, like a lower-level family room, a bedroom for a new baby, or a home office that doesn't share a thin wall with the playroom. For those spaces, it pays to talk through sound control before anything is hung. Denser board, sound-dampening insulation in the wall cavity, and resilient channel on a ceiling all have to go in early. None of them can be added once the walls are taped.


Older homes call for a different skill: blending. When a section of wall comes out for new wiring or a plumbing repair, the patch has to disappear into the surface around it. That surface might be smooth, a light orange peel, or a knockdown ceiling. We feather new compound well past the repair and match the texture before primer, so the fix doesn't flash through the paint. With the average home price in the city near $349,000 as of February 2026, according to Zillow, a visible ridge or mismatched patch is the kind of detail buyers notice on a showing.

Our Drywall Process, Step by Step

Every job follows the same basic order, but the details change from one house to the next. Here's how a project runs from the first visit to the final walkthrough, along with the local factors we plan around at each stage. Knowing the steps ahead of time makes it easier to plan around noise, dust, and the days you'd rather be out of the house.

Step 1: In-Home Walkthrough and Measuring

We start by seeing the space in person. We walk the rooms with you, measure every wall and ceiling, and mark outlets, windows, ducts, and anything else that will need careful cutting. In basements, we also check stair width and headroom. That decides whether full-length sheets can be carried down or shorter ones need to be ordered. Homes from the city's earlier decades can have tighter stairwells and lower basement ceilings than houses built during the recent growth years, and it's better to know that before delivery day.


We'll also ask how each room will be used, since a bathroom, a play area, and a guest bedroom all call for different materials. If your project needs a permit or inspection through the City of West Fargo, we'll ask where it stands. Then we work those dates into the plan so nothing gets covered before it's approved. By the end of the visit, you'll know what we'd install, roughly how long each stage takes, and what needs to be ready before we start.

Step 2: Written Quote and Scheduling

Next comes a written quote. It lists the square footage, board types, finish level, and what's included for prep, protection, and cleanup, with no vague catch-all line items. Sometimes something changes once the job is underway, such as an old patch that turns out to hide water damage. When that happens, we stop, show you what we found, and price the change before going any further. Nothing extra happens without your approval.


Scheduling takes local timing into account. Big Iron Farm Show and the Red River Valley Fair bring large crowds to the fairgrounds, and West Fest comes around each September, so we check the event calendar before booking a board delivery. For cold-weather jobs, we confirm heat is in place before the start date. We'll also mark the noisy days on the schedule so you can plan errands, naps, or work-from-home calls around them.

Step 3: Delivery, Stocking and Home Protection

On delivery day, board is carried in and stocked flat or leaned against framing in the rooms where it will be hung. That way sheets don't bow and nobody moves them twice. Each sheet gets checked for crushed corners and torn paper before it goes up. Compound, tape, and corner bead are staged in one spot, usually the garage or a corner of the work area, so materials don't spread through your living space. For basement projects, the stairwell measurements from the walkthrough pay off here, since a 12-foot sheet won't make every turn.


Then we protect the rest of the house. Runners go down along the path from the door to the work area, doorways get zippered plastic barriers, and nearby HVAC returns are covered so dust doesn't travel through the ductwork. The city added roughly 5,300 housing units between the 2010 and 2020 censuses, so plenty of homes here still have floors and trim that are close to new. We treat them that way from the first sheet to the last.

Step 4: Hanging Walls and Ceilings

Ceilings go up first so the wall sheets can support their edges. Walls follow, laid out to keep butt joints to a minimum, since those end-to-end seams are the hardest to hide. Before a sheet goes on, we sight down the framing and flag any stud or joist that's bowed enough to show through the finish. Screws are set just below the paper face without breaking it and spaced to the board manufacturer's guidelines, which keeps fasteners from popping later.


Exterior basement walls get extra care in a place with long North Dakota winters. We confirm insulation and any vapor control are installed, and inspected if required, before we cover them. Fixing either one later means tearing out finished drywall. Cutouts for outlets, switches, and recessed lights are measured and cut tight, so cover plates sit flat. Window returns are wrapped carefully too, since a crooked return is easy to spot from across the room.

Step 5: Taping, Mudding and Choosing a Finish Level

Every seam gets paper tape bedded in compound, inside corners get folded tape, and outside corners get corner bead. Then come the fill and finish coats, each spread wider and thinner than the last, with full drying time in between. This is where the heat and humidity plan from scheduling earns its keep. Compound that's rushed or left in a cold room shrinks and cracks, and those flaws show up the moment paint goes on.


We'll agree on a finish level before taping starts. Level 4 is the usual standard for painted walls with a flat or eggshell sheen. Level 5 adds a thin skim coat over the whole surface. It's worth considering where light rakes across a wall: beside large windows, along tall stairwell walls, or under rows of recessed lights in the open layouts many newer homes here use. Level 5 adds time and cost, so we'll show you where it makes a visible difference and where Level 4 will look just as good.

Step 6: Sanding, Cleanup and Final Walkthrough

Sanding is the loudest, dustiest part of the job, so we try to schedule it for hours when the house is empty. For families with kids in West Fargo Public Schools, the school day is usually the easiest window. We sand with pole sanders and check every wall with a work light held low and to the side. That angle shows ridges, pinholes, and tool marks the way afternoon sun will. Anything that doesn't pass gets another thin coat and a second sanding.


Cleanup isn't left for you. We bag offcuts and compound waste, vacuum the work area and the path to the door, and take down the plastic once the dust has settled. Then we walk the finished room with you under good light and fix anything you point out before calling the job done. The walls are left ready for primer and paint, so your painter can start right away instead of spending the first day fixing seams.

Get Your Drywall Project on the Calendar

Tell us about the rooms you want finished, repaired, or rebuilt, and we'll set up a time to see the space in person. You'll get a clear written quote covering materials, finish level, and cleanup, along with a schedule you can plan your week around. Fargo Elite Drywall serves homeowners in Fargo and the surrounding communities on both sides of the Red River.